Stage tracker
Agreement, locate, layout, posts, concrete, rails, pickets and walk-through each show a date and a note.
A fence job is built in stages: the layout, the post holes, the concrete, the rails, the pickets and the gate hardware. Homeowners ask where the crew is in that sequence, and they want the signed layout and the warranty card close at hand. We would build a customer portal for fence installers that shows each stage and keeps every signed document in one secure login.
A fence project usually begins with a site visit, a sketch of the layout and a signed agreement. The crew then marks the line, augers the post holes, pours the concrete, hangs the rails and finishes with pickets and gate. Along the way the homeowner may need to approve a layout change, a height adjustment or a gate swap.
The questions start when a stage goes quiet. The homeowner sees no crew for several days, or the concrete has cured and nobody has said when the pickets go on. The office checks the job folder, a text thread with the foreman and a spreadsheet, then calls back. A clear status page answers those questions before they are asked.
A fence portal earns its place when it cuts interruptions without adding data entry for the office. The clearest tests are the number of status calls each week and how quickly homeowners approve layout changes. If both improve, the job is running on schedule rather than waiting in an inbox.
We would build around the stages the crew already uses: agreement, locate, layout, posts, concrete, rails, pickets and walk-through. The foreman updates each stage once, and the portal reflects the change. Nobody should update the same stage in two systems, or the portal will lag behind what the field team has done.
Many fence companies schedule and invoice in Jobber or Housecall Pro, and some keep layouts in a shared drive and collect signatures in DocuSign. The portal should read from the job record where one exists and pull in signed documents rather than making staff upload them twice.
Photos from the crew can go to the job folder or to CompanyCam. We would connect only what the portal has to display, such as schedule, stage, documents and warranty, so the office keeps working in the tools it knows. A short list of connections keeps testing and upkeep manageable.
Agreement, locate, layout, posts, concrete, rails, pickets and walk-through each show a date and a note.
Layout and height changes appear with a drawing and a note, and the homeowner signs from a phone.
Agreements, drawings, locate confirmations and warranty cards are kept in one place.
Homeowners see their own project, foremen see their jobs and office staff see the full list.
Before the build starts, the company should list the stages it tracks for each fence type, the documents homeowners sign and the staff member responsible for each stage. Include the standard layout drawing and the warranty wording, since both will appear in the portal as written.
Content and access come next. Provide photos of finished work taken with permission, the care guide for each material and a sample job folder to test with. The job system, the signing tool and the domain registrar all need to be reachable so the portal can be connected and checked end to end.
The biggest cost drivers are integrations and user roles. A portal that shows stages and documents from one job system is a focused build. Adding payments, a crew view with routes or direct access for a property manager adds design, testing and security work, and each new role needs clear rules about what it can see.
Fence portals fall between $300 and $2,200, based on the stages and documents you track. We would fix the stage list and document types first, build the homeowner view and then add crew and office screens.
Begin with the phone line. A fall in the number of stage questions the office fields each week, once the portal is live, is the clearest early sign that homeowners find answers on their own. Note which questions still arrive, since those usually point to a missing stage.
Then measure approvals and handoffs. Track how long a layout change takes to come back signed, how often a homeowner logs in between stages and how many stages the foreman has to explain again on site. Review the figures monthly with the operations lead.
The foreman logs the change with a drawing and a price, and the homeowner receives a notice. If the change affects a stage that is already complete, the portal records that in the job history and flags it for the office. The approval is time stamped and stored with the project.
Yes. The portal is built for a phone, so a homeowner can check the current stage, read a note or sign a layout while standing in the yard. Pages load quickly on a weak connection, which matters on a rural lot.
They are stored with the project and visible to the homeowner and the office, but not to the public. The company sets how long the file is kept after the job closes, and the portal removes access when that period ends.
Only a short session. Foremen update each stage from a phone with a few taps, and we walk them through the screens on a real project before launch. The homeowner view is intentionally simpler than the crew view, so there is little to learn on the customer side.
Share the stages you track and the documents homeowners sign, and we will put the scope and price in writing before development begins.