Smoke schedule by cut
Each cut has its own timeline, with the start, wrap and pull steps due at set times and owned by a named person.
SIZ Group designs and builds a barbecue staff operations app for pit crews, so pitmasters, prep cooks and counter staff see their smoke schedule, temperature checks, trimming and wrapping tasks and fuel orders in one list. It replaces the scribbled pit log and the shouted question across the smokehouse with a shared plan that every shift can follow.
A smokehouse runs on long timers. A brisket can spend most of a day on the smoker, a rack of ribs needs its own schedule, and pork shoulders go in overnight so the crew can pull them before lunch. Each step depends on someone checking the pit at the right moment, and the handoff between shifts is where the plan usually breaks.
Most pits track that in a paper log tucked beside the smoker. The log is accurate only when someone writes in it, and it rarely tells the next crew what the last one planned. A pit crew shift checklist turns the same steps into tasks with owners and due times, so the early crew sees what is due before the first cut.
Every kitchen has the same concern, but the pit adds its own pressure. Wood, fuel and time all run out, and a missed check on a long cook can ruin a full batch. The app should make those risks visible on the shift list rather than leave them in someone's memory.
Many barbecue restaurants already use Toast or Square at the counter and 7shifts or Homebase for rotas. Supplier orders often arrive by email or phone, and food cost sits in a spreadsheet or in an accounting product such as QuickBooks. The staff app should read the rota and sales from those tools rather than make the crew type them twice.
Where a product publishes an API, the scoping call confirms which schedule and sales fields are available. Where a pit still keeps paper readings, the app takes the same readings as a simple entry, time-stamped, so the paper and the app can be checked against each other during the switch.
Food safety rules set the shape of the build. Cooked meat must be cooled within set time limits as it moves from the smoker to the cooler, and the local health department decides how those steps are recorded. A barbecue restaurant food safety log needs a time and a name for each step, and a past entry should never be edited quietly.
The smoker temperature log app holds the pit readings, cleaning records and supplier receipts that form part of the official record. Keep them for as long as the local rules require, and limit who can change them. A pitmaster sees the full pit log, while a counter team member sees the day's sold-out list and nothing else.
Each cut has its own timeline, with the start, wrap and pull steps due at set times and owned by a named person.
Readings are entered at set intervals, out-of-range values flag at once and corrections are added as new entries.
Each cooling step is timed and signed, so the food safety record shows what happened and when.
Wood and fuel counts sit against the weekly par level, and a low count raises a task for the order.
The closing list carries open tasks into the next shift's opening screen, with the pitmaster's note at the top.
Demand for barbecue rises and falls with the calendar. Memorial Day, the Fourth of July and Labor Day bring large pickup and catering orders, football weekends add a late-morning rush and the weeks before a holiday need extra brisket on the smoke plan. The staff app should let the pitmaster copy a holiday smoke plan onto the list and raise the wood order for that week, with the wood and fuel inventory tracker showing what is left.
The app can also show which crew members are needed for a long cook and flag a day when the pit has too few hands for the planned load. In quieter weeks the same screen lists the deep-clean tasks and smoker maintenance that are easy to delay, so they happen before the next big weekend rather than during it.
Launch needs the smoke schedule for each cut, the trimming and wrapping steps, the par levels for wood and fuel and the supplier list with lead times. Each step should be written the way the pitmaster works, because a checklist written by someone else is ignored by the crew on a busy weekend.
The restaurant also needs a clear allergen and sauce list for every product, the cooling steps from its food safety plan and a named person who approves changes to the smoke schedule. Access is limited by role, and the owner reviews who can change a temperature log or a supplier record.
Track on-time completion of smoke schedule tasks each week, along with the number of temperature readings logged at the set times. A rising completion rate, with fewer readings entered late, is the clearest sign the crew is using the plan.
Watch wood and fuel use against the par level, and the share of batches that finish on schedule. Count the trimmed loss from any cook that ran long, and compare everything with the period before launch, since your own pit is the only fair baseline.
Also check the closing list. Fewer open tasks at the end of each day means the handoff is working, and the owner should see that without asking the crew.
The crew sees only their own tasks, and each one takes a tap. Readings can be entered from a phone at the pit, and notes can be added later. The aim is to save trips to the office, not to add forms to a busy smokehouse.
It holds the temperature readings and cooling records and can print them for an inspector. Your local rules set what must be kept and for how long, and we confirm those rules before anything is built.
Not in the first release. The app shows stock against the par level and creates a task for the order, which the owner places with the supplier. Automatic ordering can be scoped later once the counts have proven reliable.
Pricing for a mobile build starts at $4,500, and the number of cuts, roles and sales or rota feeds sets the final figure. The restaurant receives each line in writing before work begins.
Book a free scoping call and we will turn your smoke schedule, temperature checks and fuel orders into a written plan for the pit.