Stage Aging Board
Every signed job by stage, with aging flags and the person or office holding it.
We build a solar operations dashboard app that shows a general manager every sold job by stage, which permits and interconnection files are aging, how crews are loaded and which lender milestones are waiting on paperwork.
In residential solar, revenue arrives in pieces. A financed job may pay out in milestones tied to install completion, inspection and permission to operate, so a project that stalls after install can hold back cash the company already spent on panels, racking and labor.
Work moves through sales, survey, design, permitting, procurement, install, inspection and interconnection, and each step lives with a different team. The breakdowns show up at the seams: a permit approved but nobody told scheduling, equipment staged for a job whose HOA approval is still pending, or an inspection passed but the interconnection packet never submitted.
Without one view across those seams, the general manager learns about stalled cash only when the controller asks why receivables are high. A dashboard that ties stage to cash makes that conversation happen weeks earlier, while there is still time to chase the missing document.
Homeowners usually compare several quotes on price per watt, equipment, financing and reviews. Many sign during a sales visit while enthusiasm is high, and that enthusiasm fades if nothing visible happens for a long time afterward.
That makes cancellations an operations problem, not only a sales one. Jobs that sit in permitting or design too long are the ones most likely to cancel, and each lost job wastes survey and design hours.
An oversight app should therefore show the age of every signed job alongside its stage, so the GM can push stuck files before the buyer starts doubting the decision. A short call from a coordinator explaining a utility delay often saves a job that would otherwise cancel.
The GM needs numbers that match finance and operations. Stage data should come from the project system, and milestone funding status should reconcile with what accounting records, otherwise the dashboard becomes one more opinion in the room. They also need to see responsibility. Every stalled job should show who holds it, whether an internal coordinator, a permitting office or a utility, so follow-up goes to the right place.
And it needs to be fast on a phone. A GM visiting install sites should be able to check permit aging by jurisdiction between stops.
Trust also depends on definitions. Sales, operations and finance should agree on what counts as sold, installed and complete before any chart is built, or the first meeting with the new dashboard will be spent arguing about whose number is right.
Every signed job by stage, with aging flags and the person or office holding it.
Permit and interconnection timing grouped by issuing office and utility, so slow spots stand out.
Lender milestones per job, showing which payments wait on inspection cards, PTO letters or photos.
Install-ready jobs set against available crews and scheduled days. Weather cancellations show alongside so lost days are easy to spot.
Sales often climb in spring and summer, and many companies face a late year crunch when buyers want systems installed before a deadline. Permitting offices and utilities get busy at the same time, so backlogs grow in places your crews cannot fix.
During ramps, the app should focus on throughput: jobs ready to install against crew capacity, and permits nearing approval so procurement can stage equipment. During the crunch, it should rank jobs by deadline risk.
Winter can leave crews idle in snowy regions while permits keep moving. Showing approved jobs alongside weather-cancelled days helps the GM decide whether to shift crews to service, battery retrofits or southern territories. A clear view of approved but unscheduled work turns a slow month into a planning decision instead of a surprise.
One mistake is counting jobs without counting money. A stage board that ignores funding milestones hides the fact that ten stalled interconnections may hold more cash than fifty jobs in design. Another is grouping all permits together. Jurisdictions differ widely, and a combined average hides the one office that is slowing a large share of your pipeline.
A third is building views nobody owns. Every chart should have a person who acts on it, or it should come off the main screen.
A fourth is forgetting the field. If crews and coordinators never see how their stage affects funding, they will not understand why a missing inspection photo matters so much. Sharing a simple version of the board with leads tends to fix that quickly.
Record a baseline before launch and review monthly. The measures below come from systems you already run, so tracking them adds no new data entry.
Review results in the same meeting where decisions are made. If permit aging improves in one jurisdiction after a change in process, that is a lesson worth spreading.
Yes, through APIs or scheduled exports, depending on what your systems allow. We confirm the approach during scoping. Where a system has no API, a nightly export is often enough for a management view.
If your team records milestone status in the project system or accounting, the app can display and age it. Lender portals themselves vary in what they share.
Roles control what each person sees. Coordinators can get their own stalled list without seeing company financials. Crew leads can see their upcoming jobs and the paperwork still missing for each.