Live project board
Each active kitchen shows its stage, designer, next trade visit and any open risk, with the most urgent project at the top.
A kitchen remodeling company can have eight or nine active projects at different stages, each with its own designer, project manager and trade calendar. A manager oversight app gives the general manager one board for every open job, showing where margin is leaking and which schedule is about to slip.
Kitchen margins rarely vanish in one dramatic moment. A homeowner asks for a pantry pullout after the cabinets are ordered, the designer agrees without a change order, and the cabinet shop bills a restocking fee. Then a countertop template misses by a quarter inch and the fabricator reprints the job. Each event is survivable on its own. Together they erase the profit the estimator promised.
The schedule has its own leaks. Plumbers, electricians and tile setters book around one another, and a single late inspection can leave a crew standing in an open kitchen with nothing to install. The general manager often hears about that delay from the project manager at the end of the week, when there is no longer time to recover the day.
Visibility is the real gap. Most remodelers learn their numbers at the close of each job, after the final invoice clears. The manager needs a view that shows cost, change orders and open items while the work is still under way.
A general manager will judge the app by whether it shows the true position of each project within a minute. Contract value, approved change orders, cost to date and remaining budget should sit side by side, and the figures should match what the bookkeeper sees.
They will also look for early warnings: a selection holding up an order, a subcontractor whose insurance certificate is expiring, or a change order that has sat pending for a week. Each warning should name the project manager responsible for resolving it. A final test is the designer view, which shows approved scope and open selections without letting a designer edit the price.
Kitchen remodels fall under home improvement contract rules in many states, and some require specific disclosures and a written change order before extra work begins. The app should store signed contracts and change orders with the project and block work on any change that has not been approved in writing.
Subcontractor compliance is the other area. Electricians, plumbers and gas fitters need current licenses, so the app should track license numbers, insurance certificates and expiry dates for every trade on the board. A lapsed certificate should trigger a warning before the trade is scheduled.
Access needs to follow roles. Designers see their projects, project managers see their schedules and the general manager sees the full cost view. Pay rates and commission details stay in the payroll system, not the operations app.
Each active kitchen shows its stage, designer, next trade visit and any open risk, with the most urgent project at the top.
Contract value, approved change orders and cost to date combine into a live margin figure for each job, with a warning if it drops below target.
Changes are approved in the app before work starts, and an unapproved change cannot be added to the trade schedule.
License and insurance status for each trade sits beside the schedule, with alerts ahead of expiry.
The general manager sees how many open selections and projects each designer carries, so work can be rebalanced before a delay appears.
We need the list of active projects with contract value, scope, designer, project manager and target completion. We also need your standard job cost categories, such as cabinets, countertops, appliances, trades and permits, and the margin target you use for each.
Share your change order process as it works today, including the approvals you actually collect. The app will reflect those steps rather than an idealized version. A few closed projects with their change histories give us real data to test the reporting against.
Reporting cost by month instead of by project is a frequent error. A monthly total hides which kitchen is over budget and which one is coming in strong. Build each report from the project record so the manager can drill from the company total down to a single cabinet order.
Letting change orders live in email is another. If a pantry addition is agreed by text, the job cost will be wrong and the homeowner will dispute the final invoice. Put every change into the app before work starts, with a signature or a timestamped approval. Avoid a dashboard only the owner can read, too. Project managers should see their own jobs in the same view, or numbers get fixed after the fact instead of managed while the work happens.
Take a snapshot of the last full year: the share of projects that finished over budget, the average value of change orders per job and the number of days a project spent waiting on an approval or an inspection. Those figures show where the company is losing margin today.
In the months after launch, check whether overruns surface earlier in the job, whether change orders are signed before work begins and whether the general manager spends less time chasing status. A steady drop in unapproved work is the clearest sign the app is protecting margin.
The app starts at $4,500 for mobile builds. Projects, reports and any accounting link determine the final price, which goes into a proposal after a free scoping call.
Yes. The project board and margin figures are designed for a phone first. Detailed job cost reports open on a desktop, so the manager can check the phone during a site visit and review the full detail later.
It is designed to. Cost entries come from the same purchase orders and invoices your bookkeeper uses, and we test a sample of closed jobs against the ledger before launch.
Margin is an owner and general manager view. Designers and project managers see schedule, open selections and change status for their own jobs, but not the company-wide margin.
Bring your current project list to a free scoping call, and get the manager board scope and price in writing.